[Home] [Location] [Technical] [Geological]

UP

Technical | Winders | South   >  Foundations

Section under development

DSC00210a-s

South winder drum pit. The walls on each side were the foundations for the original undershod brake.

DSC00604 -s02

South winder LH bed-bolt tunnel access pit.

DSC01015 -s

South winder LH bed-bolt tunnel.

DSC01019 -s

South winder LH main bearing bed-bolts

TOP


Copyright © 2005 - 2020   J S. Thatcher

Page updated on:

27 Jul, 2020

at

08:54:40 PM

In case of problems contact:

BuiltWithNOF