Pleasley Colliery Web Site


UP

Historical | Coal Mining Coal transport

Section under development

This section takes a look at how the coal was transported after it had been got

Cs face after loading 1950a -m

Bottom loading face-conveyor running between steel props - Deep Hard C panel  circa 1949 (JST)

Cs LH bow dischargea -m02

Bottom loading face-conveyor bow-discharge onto gate conveyor - Deep Hard C panel  circa 1949 (JST)

Cs main gate lip 1950a

Gate conveyor and ripping lip  - Deep Hard C panel  circa 1949 (JST)

TOP


Copyright © 2005 - 2008    J.S. Thatcher

Page updated on:

In case of problems contact:

05 May, 2009

at

11:33:04 AM

BuiltWithNOF