UP

Technical | Heapsteads | HeadgearSouth pit

Section under development

The South shaft continued in use as a ventilation shaft after the colliery had ceased production and much of its headgear remains in place although a certain amount of damage occurred around the shaft-side when it was filled and capped.

South pit  headstock

South pit  headstock

Sth pit headgear 1 -m

South pit headframe sheaves and steel-work.

Picture 032-s
South pit headstock LH thrust-leg footpad

South pit headstock LH back-stay footpad

South pit  headstock cage overwind catches

South pit  headstock empty side Bennet overwind catches

P6170933a-s

South pit  headstock detaching bells and overwind buffers

TOP


Copyright © 2005 - 2017      J.S. Thatcher

Page updated on:

05 Jan, 2018

at

01:43:24 PM

In case of problems contact:

webmaster@pleasley-colliery.org.uk

BuiltWithNOF