The South shaft continued in use as a ventilation shaft after the colliery had ceased production and much of its headgear remains in place although a certain amount of damage occurred around the shaft-side when it was filled and capped.
South pit headstock
South pit headframe sheaves and steel-work.
South pit headstock LH back-stay footpad
South pit headstock empty side Bennet overwind catches
South pit headstock detaching bells and overwind buffers