UP
Technical | Winders | South > Foundations
Section under development
South winder drum pit. The walls on each side were the foundations for the original undershod brake.
South winder LH bed-bolt tunnel access pit.
South winder LH bed-bolt tunnel.
South winder LH main bearing bed-bolts
TOP
Copyright © 2005 - 2008 J.S. Thatcher
Page updated on:
In case of problems contact:
05 May, 2009
at
11:33:04 AM