Pleasley Colliery Web Site


UP

Technical | Shafts Details

Section under development

Shaft details

  • running-on level:(above OD)
    • North (1951)
      • top deck:      525.58 ft
      • bottom deck:   514.16 ft
    • South (1951)
      • top deck:      514.11 ft
      • bottom deck:   507.79 ft
  • depth:
    • North 
      • 1877:      520 yd
      • 1955:     590 yd
    • South 
      • 1879:     512 yd
      • 1922:     903 yd
  • diameter:         14½ ft
  • alignment:       NE-SW
  • seperation:       94 yd
  • construction:
    • North 
      • 18 yd:       @ 18in brickwork
      • 117 yd:      @ cast iron tubbing
      • remainder:   @ 9in red brick
    • South
      • (18 yd):     @ 18in brickwork
      • (117 yd):    @ cast iron tubbing
      • remainder:   @ 9in red brick

Shaft cables

  • Power
  • Signal
  • Telephone
  • Telemetry

Shaft pipes

  • rising pump main
  • descending water main
  • methane extraction?

TOP


Copyright © 2005 - 2008    J.S. Thatcher

Page updated on:

In case of problems contact:

05 May, 2009

at

11:33:04 AM

BuiltWithNOF